Difference between revisions of "V1.4 SP 33.0"
From FPDS-NG
Line 106: | Line 106: | ||
<td>FAR Case 2014-005 Consolidation of Contract Requirements Phase 1 | <td>FAR Case 2014-005 Consolidation of Contract Requirements Phase 1 | ||
− | <td> 1. The data element “Consolidated Contract” has a “Base and All Options Value” Dollar Threshold of $6M | + | <td> 1. The data element “Consolidated Contract” has a “Base and All Options Value” Dollar Threshold of $6M applied on it. |
− | With the FAR Case 2014-015, the following changes will be effective starting on the Production deployment date of | + | With the FAR Case 2014-015, the following changes will be effective starting on the Production deployment date of Service Pack 33 (2/3/2016):<br> |
• This Dollar Threshold condition no longer applies<br> | • This Dollar Threshold condition no longer applies<br> | ||
• The existing ‘Yes’ and ‘No’ values will be changed to ‘Consolidated Requirements’, and ‘Not Consolidated’ respectively. | • The existing ‘Yes’ and ‘No’ values will be changed to ‘Consolidated Requirements’, and ‘Not Consolidated’ respectively. | ||
Line 114: | Line 114: | ||
2. The data element “Bundled Contract” has a “Base and All Options Value” Dollar Threshold of $6M applied on it. | 2. The data element “Bundled Contract” has a “Base and All Options Value” Dollar Threshold of $6M applied on it. | ||
− | With the FAR Case 2014-015 the following changes will be effective starting on the Production deployment date of | + | With the FAR Case 2014-015 the following changes will be effective starting on the Production deployment date of Service Pack 33 (2/3/2016):<br> |
• The Dollar Threshold condition no longer applies to the existing values<br> | • The Dollar Threshold condition no longer applies to the existing values<br> | ||
• The existing ‘Mission Critical’, ‘OMB Circular A-76’, ‘Other’ and ‘Not a Bundled Requirement’ values will be changed to ‘Bundled Requirements’, ‘Substantially Bundled Requirements’, ‘Bundled Requirements Under a FAR 7.107-1(b) Exception’ and ‘Not Bundled’ respectively | • The existing ‘Mission Critical’, ‘OMB Circular A-76’, ‘Other’ and ‘Not a Bundled Requirement’ values will be changed to ‘Bundled Requirements’, ‘Substantially Bundled Requirements’, ‘Bundled Requirements Under a FAR 7.107-1(b) Exception’ and ‘Not Bundled’ respectively |
Revision as of 23:21, 8 December 2016
Schedule
Description | Start Date | End Date |
---|---|---|
BETA Installation | January 9, 2017 | January 9, 2017 |
Government Acceptance Testing | January 24, 2017 | January 26, 2017 |
Installation in Production | February 3, 2017 | February 3, 2017 |
Document Changes
Documentation | Changes Required |
---|---|
XML Specifications | No |
Web Services | Yes |
Data Dictionary | Yes |
NASA Specific Data Dictionary | No |
Use Case Summary | No |
Validation Rules | Yes |
Reporting | No |
ezSearch | No |
Atom Feeds | Yes |
Online Help | No |
User Manual | Yes |
SPR Listing
SPR # | Enhancement/Problem | Solution | Impact to Users and Integrators |
---|---|---|---|
IAESAM-39 |
This enhancement will add the “CAGE code” to the ATOM Feeds and the Ad-Hoc Reports | The “CAGE Code” data element will be added in the new Atom Feed version 1.4.5 and will be available in the AdHoc Reporting tool. | Yes |
IAESAM-339 |
This enhancement will add the data elements “Approved By”, “Referenced IDV Type", “Referenced IDV Multiple or Single”, and “Referenced IDV Part 8 or Part 13” to the new version of the Atom Feeds. | The data elements “Approved By”, “Referenced IDV Type”, “Referenced IDV Multiple or Single”, and “Referenced IDV Part 8 or Part 13” will be added in the version 1.4.5 Atom Feed. | Yes |
IAESAM-392 |
This enhancement will add the data elements “Approved Date” and “Approved By” not included in the Atom Feeds. |
The “Approved Date” and “Approved By” data elements will be added to the version 1.4.5 ATOM feed. |
Yes |
IAESAM-389 |
The name of the Data Element “GFE/GFP Provided Under This Action” does not match the latest FAR requirements for reporting. This data element identifies whether or not Government Furnished Equipment (GFE) or Government Furnished Property (GFP) was utilized on the contract action. | The screen name of the Data Element “GFP/ GFP Provided Under this Action” will be changed to “GFP Provided Under This Action”. The values allowed in the drop down list will be updated as follows:
Current dropdown values are: Updated dropdown values are: |
No |
IAESAM-126 |
FAR Case 2014-005 Consolidation of Contract Requirements Phase 1 | 1. The data element “Consolidated Contract” has a “Base and All Options Value” Dollar Threshold of $6M applied on it.
With the FAR Case 2014-015, the following changes will be effective starting on the Production deployment date of Service Pack 33 (2/3/2016): 2. The data element “Bundled Contract” has a “Base and All Options Value” Dollar Threshold of $6M applied on it. With the FAR Case 2014-015 the following changes will be effective starting on the Production deployment date of Service Pack 33 (2/3/2016):
|
Yes |
RTC-32176 | There is no central location for the “DoD Claimant Program Code” reference list. | The FPDS-NG worksite will be updated to include the “DoD Claimant Program Code” reference list in the “Reference” section with the PSC, NAICS and more:
https://www.fpds.gov/wiki/index.php/PSC%2C_NAICS_and_more When clicking on “PSC, NAICS and more”, the “DoD Claimant Program Code” reference will be included in the list. |
No |